
after cutting the boards I laid them out

here is a close up of the joined boards

clamped in place ready to drill the holes

after drilling the holes the bolts are in place holding the basic frame together

overview of the assembled frame

close up of the cross brace showing the tongue

cut brace at other end


router with router bit to show how the groove will be cut to accomodate the tongue

router in place to show how the groove will be cut

cut groove

frame was disassembled, the brace inserted and reassembled

from another angle

after finding that the nuts and bolts would interfere with the placement of the hinges I reworked the fasteners and used T-nuts
next