This is the installation
This is how they got there. Here are two parachute strap sections threading through the rack. Also are two sets of nylon wire ties
Here is the bottom of one router. Out of view is the other one, they are lashed together with white plastic twine
This view shows the two routers, held together with the twine and separated by PVC pipe caps
The two routers are slung in the parachute cord
the routers were drawn up using a rig of the white twine and the wire ties were connected that hold the routers to the underside of the racks
Another set of wire ties are added for safety and the parachute straps are removed
The twine used for drawing up the routers is removed and the twine holding the two routers together is removed